Company:
Verify ID:
Expiration date:
Induction Brazing Manufacturing Process performed at the Ferguson Pipe Yard located at 800 Spring Street Ext. Fulton, MS 38843
Induction Brazing Manufacturing Process Verified
An independent review was conducted on the manufacture's documented induction brazing process, including manufacturing procedures, personnel qualifications, process controls, equipment records, quality documentation, and inspection activities. An on-site audit was also performed to verify that the process was being executed in accordance with documented procedures. This verification confirms the implementation of a controlled and repeatable induction brazing process and associated quality controls. Verification applies to the manufacturing process at the location above, and does not verify the performance of products produced using the process.
UL Verification is an objective, science-based assessment that confirms the accuracy of marketing claims. Our independent assessment process scrutinizes the validity of specific advertising or promotional statements, giving you a way to separate verified fact from fiction.